About Us
Products and Services
FAQs
We are a Perth based licensed land surveying firm who provide various surveying services for the general public, builders, architects, designers, real estate agents, engineers, local governments & developers.
We work in all metropolitan suburbs including Joondalup, Coolbellup, Perth, Armadale, Bassendean, Belmont, Cambridge, Canning, Claremont, Cottesloe, Fremantle, Gosnells, Kalamunda, Kwinana, Mandurah, Melville, Mundaring, Rockingham, Serpentine-Jarrahdale, South Perth, Stirling, Subiaco, Swan and more." (08) 9300 8137, 0419 117 617.
Licensed, Quotes, Registered
Detail Surveys, Development Applications, Environmental Surveys, Project Management
Open Monday - Friday
Building, Construction, Strata Conversion, Licensed Land Surveyor, Perth, Service setouts, Boundary surveys, REPEG, Feature surveys, Land surveyor
Only a Licensed Surveyor who holds a current practicing certificate can undertake an authorised survey. An authorised survey is a boundary survey which includes a subdivision or strata title.
Only a Licensed Surveyor who holds a current practicing certificate can undertake a subdivision survey.
Yes, we are a licensed surveying company and we hold a current practicing certificate.
Yes, we undertake surveys for both residential and commercial properties.
Yes. Our contour and feature surveys show all the relevant information required for design and submission to Local Government with your Development Application. It is provided in a digital format that can be opened and utilised by your builder or designer in their CAD drafting program.
Your existing fence may not be on the true boundary and you may have to remove any encroachment that occurs into your neighbouring properties. Buildings require minimum setbacks from boundaries, as required by the R Codes and Local Governments Building Policies. You should have your boundaries pegged and consider having your building set out prior to construction. This is more prudent when building a parapet wall or strata titling.
No. Your fence line may be on the boundary but generally they are only approximately on the boundary, and can be significantly off the boundary line depending on whether the boundary was marked prior to installation.
Most smaller sized subdivisions take about 8-9 months. This depends on how quickly the subdivision conditions are satisfied.
A survey-strata subdivision runs the same process as a green title subdivision, so will generally take the same timeframe ie. 8-9 months.
A Built Strata requires the building(s) to be constructed prior to obtaining Local Government approval. Generally once the building(s) have been constructed and the Building Surveyor has provided their Certificate of Building Compliance, Local Government and Landgate will take about 5-8 weeks to issue titles.