219 Towen Mount Rd Towen Mountain 4560

H2Gold

Sewage & Waste Water Treatment

Complete Waste Water Management Servicing Moreton Bay To Gympie

Be first to review
219 Towen Mount Rd, Towen Mountain QLD 4560

Map

Loading map...
Sorry, maps are currently unavailable

H2Gold opening hours in Towen Mountain


H2Gold opening hours in Towen Mountain

Mon By Appointment
Tue By Appointment
Wed By Appointment
Thu By Appointment
Fri By Appointment
Sat Closed
Sun Closed
Public Holidays Closed
Open Monday to Friday
  1. About Us

  2. Products and Services

  3. FAQs

About Us

H2Gold - Promotion

About H2Gold

AT A GLANCE
  • Septic evaluations
  • Septic tank and trench installation
  • Treatment plant servicing and maintenance
  • Plumbing and drainage
  • Fully licensed & trained service technicians
We offer the right advice, a wide range of products, quality installation & guaranteed servicing by licensed plumbers.
H2Gold have been installing and servicing many wastewater treatment systems for over 13 years. Our service areas include Sunshine Coast, Gympie and Moreton Bay Regions.

Testimonials:

The H2Gold team made the whole process of installing a new system easy. They give great site choices for drainage system piping & spent time working through & explaining what else was possible until we're happy. It was amazingly choreographed. The team of trades people required were numerous, efficient & pleasant. It was finished in a day only needing an inspection & activation of the tank next morning. It happened so fast & the site clean-up was great - J.A. Yandina.

Services:

  • Supply And Installation Of Various Types Of Treatment Plants
  • Septic Evaluations
  • Septic Conversion To Treatment Plant With Effluent Disposal (Irrigation)
  • Septic Tank And Trench Installation
  • Council Liaison
  • Treatment Plant Servicing And Maintenance
  • Plumbing And Drainage

H2Gold offers all services from the very basic to complete wastewater management for your site taking the hassle out of it for you. We are local distributors for many brands.

Payment Methods

CashChequesDirect DebitMastercardVisa
Established
2002

Products and Services

H2Gold - Promotion

Hours of Operation

Open Monday - Friday

Product

Air Pumps, Composting Toilets, Effluent Systems, Greywater Systems, Holding Tanks, Septic Tanks

Services

Council Documentation, Custom Design, Installations, Maintenance, Repairs, Sales, Site Evaluation

Offering

AWTS, Commercial, Residential, Septic Conversion

Features

Evaluations, Family Owned, Free Consultations, Free Quotes, Inspections, Licensed, Quotes, Service Contracts, Standards Australia

Catering To

Plumbers

Keywords

greywater, residential wastewater, Fuji Clean servicing, Nova Clear, domestic waste water treatment, Waste water, Gray water systems, subsurface irrigation, Nova Clear servicing, sewage treatment system, septic tank systems, wastewater treatment plant, Fuji Clean installers, Domestic grey water systems, Earthsafe, Biolytix, waste water treatment plant, septic tanks, Advantex Innoflow, home sewage treatment, wastewater management, Wastewater Sunshine Coast, waste water treatment plants, Biolytix Servicing, surface irrigation, water sewage treatment, Plumbers waste water, septic systems, septic conversion, wastewater treatment plants, Fuji Clean, waste water system, Taylex, Treatment plants, Grey water recycling, Envirocycle, treatment plant servicing

FAQs

  • Do I need council approval to install an onsite wastewater treatment plant?

    Yes. Your effluent disposal report will need to be submitted to council along with relevant application forms and fees.

  • Can you provide me with a quote without an effluent disposal report completed for my site?

    We are certainly able to meet you on site to discuss your options and provide you with an estimate only of costs involved.

  • Do all wastewater treatment plants treat the effluent to the same level?

    No. The different levels of treatment are primary, secondary, advanced secondary with nutrient removal. Your effluent disposal report will indicate the level of treatment required for your site. The level of treatment required will also be a factor in which treatment plants will be suitable for your site.

  • How long does it take for council approval?

    Once the effluent disposal report is completed and submitted to council, it takes approximately 10-15 working days for approval.

  • How long will my installation take?

    Once the council has approved your project, the installation will take 1-2 days.

  • How will my treated effluent be dispersed?

    The treated effluent can dispersed by trenches, surface (sprinklers - above ground) or subsurface (drip - below surface) irrigation.

  • If I surface irrigate, does the effluent need to be sterilized?

    To surface irrigate the effluent must by treated prior to dispersal. This is done by the use of chlorine, UV light or membrane filter.

  • Does my treatment plant have to be serviced as per the manufacturer's service guidelines and is the scheduled servicing of my system compulsory by Local Council?

    Yes, your treatment plant must be serviced as per the manufacturers servicing schedule guidelines and a complete maintenance/service report issued to council. This is Local Authority Law. Your service provider must hold a current drainers license with a wastewater endorsement. They must also be BSA Licensed.